MiniBooNE Tank Scaffold Installation

MiniBooNE Tank Scaffold Installation

Photos from January 5-6, 2001

Note: most of these images were lost in a disk crash...

From January 5 through 8, Bartlett Services installed scaffolding in the MiniBooNE tank. These pictures show progress during the first day and a half (when I had to leave). By the end of Day 2, the framing was complete to the top of the tank. On Day 3, the remaining decking and the planking on the outriggers were installed. Day 4 was mostly used for cleanup. Bartlett did a fabulous job for us! 
  
   

To see a picture in full size right click on the picture and select "View image" from the list.

(l) Scaffolding parts filling Roundhouse before installation.
(r) The Marines lowering a load of decking.
Image removed.Image removed.  
(l) Day 1: getting started with framing: 11:00 am.
(r) Progress accelerates when first square established.
Image removed.Image removed.  
(l) Most of the lowest level in: .
(r) Start of stairway and second level: ~7:30 pm.
Image removed.Image removed.  
(l) Day 2: stair treads and more of level 2 in.
(r) Level 2 decking and stair to level 3 complete: 2:30 pm.
Image removed.Image removed.  
Detail of scaffolding. The feet had glued-on rubber pads to protect the tank. Only the feet touch the tank.Image removed.